336-373-1538New construction moisture testing, duct and blower door testing, PRV clearance, and LEED v4.1 IAQ support. ESG integrates into your build schedule without slowing progress, and gives you documentation built to stand up to scrutiny.
Building a LEED-certified project? ESG provides the IAQ flush-out and construction testing documentation required for LEED v4.1 EQ credits, coordinated around your punch list and occupancy schedule.
ESG testing milestones are designed to integrate into the construction schedule, not disrupt it. Here are the most common situations we handle for builders.
Pre-drywall moisture testing catches elevated readings before they're locked behind walls. A single moisture issue discovered at this stage costs far less than a warranty callback after occupancy.
ESG provides the construction IAQ testing, flush-out documentation, and pre-occupancy air quality sampling required for LEED v4.1 Indoor Environmental Quality (EQ) credits.
Blower door and duct leakage testing verifies the building envelope and mechanical system perform to spec before drywall or final finishes. Catch failures before they're buried.
From foundation to final walkthrough, ESG has the testing services that protect your warranty, satisfy your code official, and support your LEED documentation package.
Pre-drywall moisture readings across framing, subfloor, and sheathing. Catch elevated moisture before it's sealed in, before mold growth, structural damage, or a warranty claim can develop.
Learn about construction moisture testingBuilding envelope air tightness and duct system leakage testing per ASHRAE and RESNET standards. Required for many energy codes and LEED projects, and essential to confirming mechanical system performance.
Learn about blower door testingPre-occupancy air quality sampling, construction IAQ management plan support, and flush-out documentation for LEED v4.1 EQ credits. Reports formatted for submission to the GBCI.
Learn about LEED IAQ testingWhen moisture or mold is discovered and remediated during construction, ESG's independent PRV clearance confirms the issue was resolved before the work is enclosed. Protects you and your buyers.
Learn about PRV
Builders need environmental testing that fits the schedule, not a firm that causes delays. ESG coordinates directly with your superintendents and project managers to hit the right windows (pre-drywall, rough mechanical, and pre-occupancy) without holding up your trades.
Every report is peer-reviewed by two certified professionals, with documentation built to stand up to scrutiny. And because we never perform remediation, there's no conflict of interest. If we find a problem, it's because there is one, not because we want to sell you a remediation contract.
Schedule Construction TestingESG's construction testing follows the natural phases of the build, so testing happens at the right time without disrupting your trades or timeline.
We test framing, sheathing, and subfloor moisture levels before walls are closed. Any elevated readings are documented and flagged before they become a future warranty issue.
Blower door and duct leakage testing after mechanical rough-in confirms system performance to code and LEED requirements before finishes are applied.
Final air quality sampling confirms the completed building meets indoor air quality standards before keys are handed to the buyer or tenant. Required for LEED EQ credits.
All testing reports, lab results, and LEED-formatted documentation delivered in a single package, ready for code official review, GBCI submission, or buyer disclosure.
Problems are caught at the cheapest possible moment: during construction, before walls are closed and finishes are applied. Your documentation package protects you from future warranty claims.
Moisture issues, duct leakage, and IAQ problems discovered after occupancy cost multiples more to address, and expose you to warranty claims, litigation, and reputational damage.

The most valuable windows are pre-drywall (framing moisture check), after rough mechanical (blower door and duct testing), and pre-occupancy (final IAQ sampling). Contact us early to plan testing milestones into your schedule, not around it.
A blower door test measures the airtightness of the building envelope by depressurizing the structure and measuring airflow. Duct leakage testing checks how much conditioned air is lost through duct system leaks. Both are required for many energy codes and LEED projects.
We provide pre-occupancy IAQ test results, construction IAQ management plan documentation, and flush-out verification formatted for GBCI submission. We're familiar with LEED v4.1 EQ prerequisites and credit requirements and can help you understand what testing is needed for your project.
Yes. We regularly work with builders who have multiple projects at various stages. Coordinating across sites with your superintendents is standard practice for us. Contact us to discuss your project pipeline.
We document the findings and provide clear guidance on what type of remediation or drying is required. After remediation, we perform independent PRV testing to confirm the issue is resolved before the work is enclosed. Our findings are honest; there's no incentive for us to inflate or minimize a problem.
Yes. ESG serves single-family residential, multifamily, light commercial, and institutional construction projects across NC, VA, and TN. Service scope and testing protocols vary by project type. Call us to discuss your specific project.

Schedule moisture, mechanical, and IAQ testing that integrates into your construction timeline, and gives you the documentation you need at every phase.